Penmann Climatic Systems Ltd was appointed to design and install a comprehensive commercial air conditioning and air flow solution for the Hotel Chocolat facility at Hadley Park. The task covered numerous production and processing zones including the West Wing, Velvetiser and Despatch areas, each with distinct temperature specifications to support https://www.penmann.co.uk/case-studies/hotel-chocolat-air-conditioning-for-west-wing-velvetiser-and-despatch-areas/